28.07.2025
- Block arrangement
- Partitioning works
Watch Video
17.03.2025
Tower B
- The Installation of interior partitions is ongoing
- The installation of windows is ongoing
- The installation of elevators is ingoing
Watch Video
9.02.2025
Tower B
- Elevator Installation Process
- Elevator Installation Beigns
- Installation Process Elevator Motor
- Preparatory Work for Balcony Storm Drains
Watch Video
2.10.2024
Tower B
- Elevator Installation Process
- Elevator Installation Beigns
- Installation Process Elevator Motor
- Preparatory Work for Balcony Storm Drains
Watch Video
2.10.2024
Tower A
- The Foundation has been poured
- Pool area prepared and poured with concrete
Tower B
- Installation of window facades in progress
- intarior partitioning works are in progress
- the elevator shaft is being installed
- internal communications and sewerage works are in progress
Tower C
- Site clearance and foundation preparation works have started
Watch Video
3.09.2024
Tower A
- The Foundation has been poured
- Pool area prepared and poured with concrete
Tower B
- Installation of window facades in progress
- interior partitioning works are in progress
- internal flooring works have been completed.
- Elevators have been delivered and preparation for installation is underway.
- Internal communications and sewerage works are in progress
Watch Video
15.07.2024
Tower A
- Foundation pouring works are started
- Preparation of the territory and pouring of the pool area is performed
Tower B
- Installation of window facades is in progress.
- Works on construction of internal partition walls are in progress
- Floor construction works are completed.
Watch Video
15.06.2024
Tower A
- The foundation has been poured
- Pool area and poured with concrete
Tower B
- Installation of window facades is in progress
- works on construction of internal partition walls are in progress
- Floor construction works are completed
Watch Video
15.05.2024
Tower A
- Work Continues on the installation of foundation piles.
Tower B
- Works on installation of window facades continue.
- Works on construction of internal partition walls are in progress
- The last 9th has been poured.
Watch Video
13.04.2024
Tower B
- Works on installation of window facades continue.
- Works on pouring screeds with noise insulation continue.
- Works on construction of internal partition walls are in progress
Watch Video
8.03.2024
Tower A
- Preparations for pouring the concrete pad for the foundation of tower A were completed.
Tower B
- Works on installation of window facades continue.
- Works on pouring screeds with noise insulation continue.
- Works on internal communications continue
- The floor has been poured
Watch Video